Different starting points, different answers. Read the row that sounds like you.
|
Your business |
What you need |
What EFFORT does |
|
Commercial lighting brands → |
Add an emergency lighting category |
ODM — housing, finish, packaging and silk-screen matched to your brand |
|
Emergency lighting factories → |
Move production to China |
OEM — build to your design, under NDA and IP protection |
|
Fire safety brands → |
Bundle emergency lighting with fire products |
Fire-linkage capable products, full certification package |
|
Electrical & wiring brands → |
Extend the category range |
Modular SKUs, low starting MOQ, fast sampling |
Most contract manufacturers offer one model. We offer three, because the right answer depends on how long you plan to sell the product.
The single biggest reason brands hesitate to manufacture in China. Four commitments, all contractual.
Every claim below is a number you can verify during a factory audit.
Every claim below is a number you can verify during a factory audit.
|
Route A — Standard-based ODM
TOTAL 28–35 DAYS
|
||||
| # | Stage | EFFORT delivers | You provide | Days |
| 1 | NDA & requirements | Signed NDA, requirements checklist | Product spec or target market | 1–2 |
| 2 | Selection & quotation | Product proposal, quotation | Model confirmation | 2–3 |
| 3 | Branded sampling | Samples in your colour, logo and packaging | Sample approval | 7–10 |
| 4 | Mass production | Scheduling, in-process QC reports | — | 15–20 |
| 5 | Delivery & after-sales | Logistics, test reports, warranty | — | — |
| Route B — Custom ODM & OEMTOTAL 35–56 DAYS
|
||||
| # | Stage | EFFORT delivers | You provide | Days |
| 1 | NDA & requirements | Signed NDA, requirements checklist | Drawings, spec or target market | 1–2 |
| 2 | Feasibility & quotation | Technical proposal, BOM, quotation | Confirmation | 3–5 |
| 3 | Industrial design & 3D | 3D model, CAD drawings | Design feedback | 5–10 |
| 4 | Sampling & pre-testing | Samples, DEKRA CTF1 pre-compliance report | Sample approval | 7–15 |
| 5 | Tooling & pilot run | Tooling (registered per agreement), pilot batch | Pilot approval | 20–30 |
| 6 | Mass production | Scheduling, in-process QC reports | - | 15–25 |
| 7 | Delivery & after-sales | Logistics, test reports, warranty support | - | |
FAQ
Building 11, No. 1999, Yongmao East Road, Ningbo High-Tech Development Zone, 315000